01Process
Four steps,
no mystery.
A typical project takes two to four weeks from signed direction to launch. The pace depends mostly on how quickly photos and copy are ready.
Enquire
You send a short email: what the business does, where it operates, what the site needs to achieve, and any existing site or social profiles. There is no form to fill in and no discovery call to book.
- We reply within two working days
- You get an honest view on whether we are the right fit
- If it is a fit, we propose a scope and a figure in writing
Direction
Before any design, we agree what the site is for. Who visits it, what they need to see, and what action they should take. This is where the structure and the visual direction are set.
- Page structure and content hierarchy agreed
- Type, colour and photography direction proposed
- Scope, timeline and payment terms confirmed in writing
- Deposit invoice issued; work begins on receipt
Build
Design and development happen in the same pass. You see real pages in a browser, on your own phone, rather than a flat image of a homepage. Feedback is collected in one round at the end of each stage.
- Homepage design first, then interior pages
- Responsive build at phone, tablet and desktop
- Content loaded, images compressed, links checked
- Two rounds of revisions included
Launch
The site goes live on your domain. We check the things that quietly break launches — redirects, email links, mobile menus, page speed — before handing over.
- Domain, DNS and SSL confirmed
- Analytics and search-console setup
- Cross-browser and mobile checks
- Handover walkthrough and written guide
02What we need from you
Good input,
good output.
Photography. Real photos of the business, the team and the work. Phone photos are fine if they are sharp and well lit — a good photograph of the actual shop beats a polished stock image every time.
Copy. A short description of what you do, who you do it for, and why someone should choose you. We will edit and structure it; we will not invent claims about your business.
Details. Opening hours, service area, email address, social links, and any accreditations you can evidence.
We can launch with a small set of licensed images and replace them later. What we will not do is build a site around stock photography and call it finished — it reads as generic, and it undermines the whole point.
03Revisions & timelines
The rules,
up front.
- 01Two revision rounds. One after the homepage design, one after the full build. Each round is a single consolidated set of comments — not a drip of separate emails.
- 02Revisions means refinement. Changing wording, swapping images, adjusting spacing and correcting details. A change of direction after sign-off is new work, scoped and quoted separately.
- 03Timeline starts on receipt of deposit and content. If photos and copy arrive late, the launch date moves by the same number of days. We will tell you as soon as that happens.
- 04One point of contact. Feedback comes from one person on your side. It keeps the project moving and avoids contradictory notes.
- 05After launch. Thirty days of bug fixes are included — anything that does not work as agreed. New features and content changes are quoted separately.